In conjunction with Exxon’s subcontractor, KKC, SWSI personnel were tasked with initial gas detection and clearance of in excess of 45 confined space work locations. This was a 24 Hr operation with team members required to clear spaces pre-shift and as an ongoing operational requirement during any given shift. This project was a direct result of the lack of capacity …
Gas Monitoring, Hazard Assessment, Permitting and Response to ABB
SWSI personnel provided an on-site team for confined space entry and standby rescue services during the pre-commissioning of the main transformer substation at a large construction site. Responsibilities included pre-entry & continuous confined space gas testing, set-up and inspection of fall protection/confined space entry/rescue equipment.